Journal Articles

Result of dismantlement on the turbine systems in FUGEN

Aratani, Kenta; Takiya, Hiroaki; Koda, Yuya; Ishiyama, Masahiro; Tezuka, Masashi; Mizui, Hiroyuki

Proceedings of 27th International Conference on Nuclear Engineering (ICONE-27) (Internet), 5 Pages, 2019/05

The prototype advanced thermal reactor FUGEN is the heavy water-moderated, boiling light water-cooled, pressure tube-type reactor, and has progressing the decommissioning since 2008. The most of facilities such as turbine system have the system structure and the operating conditions similar to those of BWR, although FUGEN has the characteristic structure of reactor core and the heavy water treatment facilities. In Japan, the knowledge and findings from FUGEN decommissioning activities are very important and valuable to perform BWR decommissioning in future, because the decommissioning of FUGEN is research and development as the first decommissioning of real-scale reactor. In the first phase of FUGEN decommissioning activities, the dismantlement project of reactor core cooling system started. By 2017, the low-level contaminated equipment such as the condensers of turbine system and the main-steam pipes of main-steam system was dismantled, and the management data was accumulated. The knowledge and findings from the 10 years of dismantlement experience will be reflected to the future dismantlement of higher contaminated facilities.

Oral presentation

Current status and future planning of decommissioning in FUGEN

Tezuka, Masashi

no journal, , 

FUGEN was approved the decommissioning program in 2008, and completed the tritium removal and dismantling condensers which are large-sized equipments in about 10 years so far. Also, based on the approval of the change in the decommissioning program, the completion of the discharge of spent fuel was extended in 2026. Furthermore, we will conduct a dismantling mock-up test using SUMADECO, which started operation in June 2018, to begin the dismantling of reactor core structures to be started in 2023, and verify the disassembly procedure.